ACTIVE MISSION · ORBITER-7 · LIFT-OFF
DAY 142 · ASCENT PHASE
The fleet has achieved nominal telemetry across 47 nodes. Primary thrust envelope holding within 2.3% of target. Next scheduled burn in 00:47:22.
ASCENT PROGRESS · 68%ETA · 01:52:18
QUICK METRICS · LAST 5 MIN
98.2 %
Signal integrity
+24.7 m/s²
Acceleration
42.1 °C
Core temp
1.18 TB/s
Data throughput
FLEET POWER
412kW
UPLINK LATENCY
34ms
ACTIVE NODES
47 / 47
ANOMALIES · 24H
03
TELEMETRY · THRUST PROFILE · LAST 4 HR
■ Actual■ Predicted
FLEET STATUS · 47 NODES
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
OPERATIONS LOG · REAL-TIME
14:32:07OKBurn sequence #142-B completed · Δv = +12.4 m/s nominal.
14:31:48INFTelemetry packet received from NODE-14 · signature verified.
14:31:22WRNNODE-06 · core temp rising at 0.4°/min · within tolerance.
14:30:59INFGround station HANOI-03 · handshake renewed · RTT 34 ms.
14:30:14ERRNODE-14 · packet checksum failed · retry 1/3.
14:29:47OKAttitude correction sequence executed · 3.2 m/s applied.
14:29:12INFScheduled maneuver #143 queued for UTC 15:19:30.